Project Gallery 10   - Asbestos Abatement & Restoration Project                                 Home     Previous    Next     
Page 2 of 2                                                                              
Asbestos worker spraying amended water to interior plastic walling prior to dismantling of the plastic sheeting.
                 Dismantling of plastic sheeting and placement of same inside asbestos plastic bags.
                   Plastic Bags with warning labels are stored temporarily inside a disposal-staging area  
                       Then loaded into a waiting truck outside.
And properly covered and secured before leaving for disposal to approved landfill area
off base.